New Construction at NGM!

It is great to see all the progress being made on the new 60' x 80' Multipurpose Building at NGM Camp Bethesda! The second story 26' x 60' floor was poured back on September 9th. The metal roofing has also been installed enclosing the building.

We have made good progress on the inside finishing work (see the new pictures below!) Additional funds are still need in order to buy the materials that are still needed.

We also need volunteers who can help with the work. If you or a group from your church can assist with this, please notify the NGM Home Office to arrange a work schedule.

Materials needed:

  1. Wall studs
  2. Sheetrock and fasteners
  3. Sheetrock compound
  4. Electrical wiring
  5. Entrance/breaker panel
  6. Wall receptacles
  7. Lighting fixtures
  8. Plumbing materials
  9. Bathroom fixtures
  10. Heating and air units
  11. Kitchen equipment
       